x86/resctl: fix scheduler confusion with 'current'
commit
bc16511409bca75c93770f45846051d85db1013b upstream.
The implementation of 'current' on x86 is very intentionally special: it
is a very common thing to look up, and it uses 'this_cpu_read_stable()'
to get the current thread pointer efficiently from per-cpu storage.
And the keyword in there is 'stable': the current thread pointer never
changes as far as a single thread is concerned. Even if when a thread
is preempted, or moved to another CPU, or even across an explicit call
'schedule()' that thread will still have the same value for 'current'.
It is, after all, the kernel base pointer to thread-local storage.
That's why it's stable to begin with, but it's also why it's important
enough that we have that special 'this_cpu_read_stable()' access for it.
So this is all done very intentionally to allow the compiler to treat
'current' as a value that never visibly changes, so that the compiler
can do CSE and combine multiple different 'current' accesses into one.
However, there is obviously one very special situation when the
currently running thread does actually change: inside the scheduler
itself.
So the scheduler code paths are special, and do not have a 'current'
thread at all. Instead there are _two_ threads: the previous and the
next thread - typically called 'prev' and 'next' (or prev_p/next_p)
internally.
So this is all actually quite straightforward and simple, and not all
that complicated.
Except for when you then have special code that is run in scheduler
context, that code then has to be aware that 'current' isn't really a
valid thing. Did you mean 'prev'? Did you mean 'next'?
In fact, even if then look at the code, and you use 'current' after the
new value has been assigned to the percpu variable, we have explicitly
told the compiler that 'current' is magical and always stable. So the
compiler is quite free to use an older (or newer) value of 'current',
and the actual assignment to the percpu storage is not relevant even if
it might look that way.
Which is exactly what happened in the resctl code, that blithely used
'current' in '__resctrl_sched_in()' when it really wanted the new
process state (as implied by the name: we're scheduling 'into' that new
resctl state). And clang would end up just using the old thread pointer
value at least in some configurations.
This could have happened with gcc too, and purely depends on random
compiler details. Clang just seems to have been more aggressive about
moving the read of the per-cpu current_task pointer around.
The fix is trivial: just make the resctl code adhere to the scheduler
rules of using the prev/next thread pointer explicitly, instead of using
'current' in a situation where it just wasn't valid.
That same code is then also used outside of the scheduler context (when
a thread resctl state is explicitly changed), and then we will just pass
in 'current' as that pointer, of course. There is no ambiguity in that
case.
The fix may be trivial, but noticing and figuring out what went wrong
was not. The credit for that goes to Stephane Eranian.
Reported-by: Stephane Eranian <eranian@google.com>
Link: https://lore.kernel.org/lkml/20230303231133.1486085-1-eranian@google.com/
Link: https://lore.kernel.org/lkml/alpine.LFD.2.01.0908011214330.3304@localhost.localdomain/
Reviewed-by: Nick Desaulniers <ndesaulniers@google.com>
Tested-by: Tony Luck <tony.luck@intel.com>
Tested-by: Stephane Eranian <eranian@google.com>
Tested-by: Babu Moger <babu.moger@amd.com>
Cc: stable@kernel.org
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>